Suspension Cables: 196 galvanised steel ropes arranged in 37 parallel strands, 5 m diameter.
Anchorages: Massive concrete structures on each bank, each containing about 100,000 m³ of concrete, 24,500 tonnes of specially coated prestressing cables and 1200 tonnes of structural steel.
Decks: Steel box, 28.5 m wide and with depths varying between 3 m at the piers to 2.5 m at the centre. Total area is about 150,000 m². The deck carries eight traffic lanes, two footways and a central reservation.