Opened January 10, 1863, the Metropolitan Railway — world's first underground passenger railway — ran steam-hauled wooden carriages between Paddington and Farringdon. Today, "the Tube" spans 250 miles (402 km), 272 stations, 11 lines, carrying ~5 million passengers daily (pre-COVID).
Sub-surface lines (Circle, District, Hammersmith & City, Metropolitan): Cut-and-cover construction, larger tunnels, air-conditioned trains (S Stock).
Deep-level tubes (Bakerloo, Central, Jubilee, Northern, Piccadilly, Victoria, Waterloo & City): Bored tunnels, smaller gauge, deeper, older stock (mostly 1990s-2000s).
DLR & London Overground (TfL-operated, branded separately): Light rail and suburban rail integrated into fare system.
Aging infrastructure (some tunnels 160+ years), capacity crunch on core sections, funding uncertainty post-COVID ridership drop (~70% recovered). Modernization: 4G in tunnels (2024), new Piccadilly line trains (2025+), potential Bakerloo extension to Lewisham.
The Tube remains London's circulatory system — imperfect, crowded, but utterly indispensable to the city's functioning.