Suez Canal Transit Time: Average 15–17 Hours
Average transit: 15–17 hours for a full northbound or southbound passage through the 193-km (120-mi) canal.
Variables Affecting Duration
- Vessel size/draft: Larger = slower, more careful maneuvering.
- Convoy system: Northbound/southbound convoys alternate; wait for slot.
- Traffic density: 50–100 ships/day; queues at anchorages (Port Said, Great Bitter Lake).
- Weather: Wind (sandstorms), fog, high seas at entrances.
- Pilotage: Mandatory SCA pilots; shift changes.
- Speed limits: 7.5–8.5 knots in channel; slower in lakes.
Process
- Arrive anchorage → board pilots (2–3).
- Enter convoy → transit channel (ballast tanks adjusted).
- Great Bitter Lake: passing/holding loop.
- Exit → disembark pilots → proceed.
Fastest / Slowest
- Fast: ~11 hrs (light traffic, optimal conditions).
- Slow: 24+ hrs (congestion, incidents, groundings).
Economic Note
Tolls: $200K–$800K+ per transit (by SCNT tonnage). Time = money; owners optimize speed vs. fuel.