How Do Tall Ships Pass Tower Bridge? The Bascules Rise
Tall ships do not pass under Tower Bridge's fixed spans. Instead, Tower Bridge is a bascule (draw)bridge: its central roadway splits into two leaves that pivot upward, clearing the full width of the River Thames for vessel passage.
How It Works
- Counterweighted Bascules: Each 1,000-ton leaf rises to ~86° in ~90 seconds, powered by hydraulic engines (originally steam, now oil/electric).
- Clearance: Open span provides ~42.5 m (139 ft) vertical clearance at high tide.
- Mast Lowering: The tallest ships (e.g., full-rigged ships) may still need to lower topmasts or topsails.
Scheduling
- Bridge lifts are pre-booked (24+ hours notice).
- ~800–1,000 lifts per year.
- Free for vessels; road traffic pauses during lifts.
Iconic Moments
Royal yachts, Tall Ships Races, the Cutty Sark (by barge), and Olympic/Paralympic flames have all passed through the raised bascules—a living symbol of London's maritime heritage.