Vancouver SkyTrain: Automated Rapid Transit System

Canada's Longest Automated Metro Network

The Vancouver SkyTrain is a fully automated, driverless rapid transit system serving Metro Vancouver, British Columbia. It's the world's longest fully automated rapid transit system.

Three Lines, One Integrated System

LineColorRouteOpened
Expo LineDark BlueWaterfront ↔ King George (Surrey)1985
Millennium LineYellowVCC-Clark ↔ Lafarge Lake-Douglas (Coquitlam)2002
Canada LineLight BlueWaterfront ↔ Richmond-Brighouse / YVR Airport2009

Key Features

  • Fully automated: No drivers – computer-controlled (SelTrac signaling)
  • Elevated guideways: Mostly above ground – "Sky" Train
  • High frequency: 2-5 min peak, 6-8 min off-peak
  • Integrated fares: Compass Card system across TransLink network
  • Airport link: Canada Line connects downtown to YVR in 26 min

Network Stats

  • 79.6 km (49.5 mi) total track
  • 53 stations
  • ~500,000 weekday boardings (pre-pandemic)
  • 95%+ on-time performance

Future Expansion

  • Broadway Subway (Millennium Line extension to UBC) – under construction
  • Expo Line extension to Langley – planned
  • Gondola to SFU Burnaby Mountain – proposed

SkyTrain is the backbone of Metro Vancouver's transit, enabling car-light living in a region committed to sustainability.

Copyright Wanderlust World © https://www.ynyoo.com