The Snowy Hydro Scheme (Snowy Mountains Hydro-electric Scheme) is Australia's largest engineering project (1949–1974), diverting Snowy River waters westward through tunnels/power stations to the Murray/Murrumbidgee for irrigation and power. Three enduring advantages:
Unlike solar/wind, hydro is dispatchable—generators spin up in 90 seconds. The Scheme provides ~4,000 GWh/year (5–7% of NEM) and critical peak/shoulder capacity (2,000+ MW). Snowy 2.0 (pumped hydro expansion, ~2027) adds 2,000 MW / 350 GWh storage, acting as a giant battery for renewables firming.
The Scheme captures ~1,000 GL/yr of snowmelt (otherwise flowing to Bass Strait) and releases it into the Murray & Murrumbidgee. This underpins:
The Scheme is a rare "triple win": clean energy, water security, nation-building—though ecological costs (Snowy River flow reduction) remain managed via environmental releases.